Not only building new. Not only do we restore what we destroy. And we also improve what we can.

Today we are working on the reconstruction of the substation and the introduction of an automated process control system in the west of Ukraine.

Substation-330/110/35/10 KV with two 330/110/35 KV autotransformers, two 35/10 KV power transformers. 
The total amount of planned work on the site is impressive.

Among them:
✅️ reconstruction of an open switchgear of 330 KV, 110 kV, 35 KV with replacement of switching equipment, busbars and insulation of an open switchgear, cable and wire products and cable systems, construction work to replace portals and Portal racks, foundations and
supporting structures for high-voltage equipment, oil receivers of power transformers;
✅️ construction of new buildings for the installation of 330 KV and 110 kV relay panels;
✅️ installation of a new complete switchgear-35 KV for new transformers of their own needs;
✅️ construction of new oil receivers and installation of new transformers for your own needs;
✅️ installation of a new diesel generator and cabinets for your own needs;
✅️ replacement of the substation grounding system, and installation of new water pipes and sewers on the territory of the substation;
✅️ construction of new and reconstruction of existing PS fire alarm systems;
✅️ reconstruction of the existing room of relay panels for a control room;
✅️ and️ that's not all.

There's a lot of work ahead, but we'll redo everything! We work without slowing down!