Electrical substation

Construction and reconstruction of substations of all voltage classes.
EDS-Engineering has all the necessary permissions to carry out design, construction, commissioning, and commissioning of electrical substations with voltage classes from 10 to 330 kV.

Cable lines

Connection to networks and documentation services at all stages
EDS-Engineering specialists use modern methods that allow cable laying in trenches, tunnels, channels, and ducts.

Power supply and network connection

Connection to networks and documentation services at all stages
EDS-Engineering specialists have many years of experience in this field and have repeatedly implemented complex projects to connect residential facilities, retail chains, gas stations, farms, industrial enterprises, warehouses, workshops, and other structures to the power grid.

Industrial solar power station

A full cycle of construction of industrial solar power stations
EDS-Engineering has been building solar power stations of any complexity. A professional approach to the construction of a power station will ensure the rapid construction and launch of a solar power station, including a high-powered one.
Electrical substations
Cable lines
Electricity and network connection
Industrial solar power station

Advantage

Over 10 years of
experience in the construction of solar power stations and substations
2 500 projects
in the field of electricity and energy
3000 units
switchboard equipment under the trademark of EDS
500 company professionals
of the company, including temporarily attracted to objects
1st place
in the rating of designers of SPS according to the GetMarket investment platform
More than 900 MW
The total capacity of the designed SPS
More than 220 MW
photovoltaic capacities were built “from scratch” throughout Ukraine
4th place
in the rating of general contractors of SPS according to the GetMarket investment platform

EDS Engineering projects

The project is completed
SPS 19,5 MW «Belozerka»
  • Installed capacity of photovoltaic modules — 22,5 MW;
  • Inverter capacity of station – 19,5 MW;
  • The volume of annual electricity generation is 29787 MW/year;
  • CO2 reduction – 16594,5 tons;
  • The number of «Risen» photovoltaic modules (PV modules) – 66 232 pcs. with a capacity of 345 W;
  • The number of «АВВ - PVS-120-TL» inverters – 162 pcs. 120 kW each;
The project is completed
SPS 15 MW «Foton Energy»
  • Installed capacity of photovoltaic modules — 22,5 MW;
  • Inverter capacity of station – 15 MW;
  • The volume of annual electricity generation is 22190 MW/year;
  • CO2 reduction – tons;
  • The number of «Risen» photovoltaic modules (PV modules) – 54000 pcs. with a capacity of 325 W;
  • The number of «АВВ - PVS-120-TL» inverters – 120 рcs. 120 kW each;
The project is completed
SPS 2 MW «Sun Energy»
  • Installed capacity of photovoltaic modules — 2,16 MW;
  • Inverter capacity of station – 2,0 MW;
  • The volume of annual electricity generation is 2454 MW/year;
  • CO2 reduction – 1702 tons;
  • Number of “Jinko” photovoltaic modules (PV modules) – 8000 pcs. with a capacity of 270 W;
  • Number of «SMA-25» inverters – 80 pcs. 25 kW each;
The project is completed
SPS 7 MW «Sun Energy Megirich»
  • Installed capacity of photovoltaic modules — 8.31 MW;
  • Inverter capacity of station – 7,0 MW;
  • The volume of annual electricity generation is 10 041 MW/hour;
  • CO2 reduction – 4417,14 tons;
  • FEM production "RECOM RCM-325-6PA" - 25200 pcs. 330 W each;
  • Quantity and power of HUAWEI SUN2000-36KTL inverters - 175 pcs. x 40 kV;
The project is completed
SPS 2 MW «Alanta Energy»
  • Installed capacity of photovoltaic modules — 2,3 MW;
  • Inverter capacity of station – 2,0 MW;
  • The volume of annual electricity generation is 2518 MW/year;
  • CO2 reduction – 4377 tons;
  • The number of “Jinko Solar” photovoltaic modules (PV modules) – 4200 pcs. with a capacity of 270 W;
  • The number of “Talesun” photovoltaic modules (PV modules) – 3600 pcs. with a capacity of 325 W;
The project is completed
SPS 19,5 MW «Belozerka»
SES construction
The project is completed
SPS 15 MW «Foton Energy»
SES construction
The project is completed
SPS 2 MW «Sun Energy»
SES construction
The project is completed
SPS 7 MW «Sun Energy Megirich»
SES construction
The project is completed
SPS 2 MW «Alanta Energy»
SES construction

Projects on the map