SPS 7 MW «Sun Energy Megirich»

Power: 7,0 MW
Area: 12 ha
The construction period: 02.2018 - 07.2019
Start generated: 02.2018
0 Technical
features
1 Type of
works
2 System
protection
3 Conditions
operation
4 Reviews
5 Video
0
  • Installed capacity of photovoltaic modules — 8.31 MW;
  • Inverter capacity of station – 7,0 MW;
  • The volume of annual electricity generation is 10 041 MW/hour;
  • CO2 reduction – 4417,14 tons;
  • FEM production "RECOM RCM-325-6PA" - 25200 pcs. 330 W each;
  • Quantity and power of HUAWEI SUN2000-36KTL inverters - 175 pcs. x 40 kV;
  • Number of load-bearing steel structures - 360 pcs;
  • Complete transformer substation KTP 2000/35/0,4 - 4 pieces of production EDS-Engineering

 

Appointment:

  • Conversion of solar energy to ~ 35000 V, 50 Hz electric power and its transmission to the electricity grid to other consumers.

 

Accounting for electricity:

Bidirectional counter:

  • on generation networks - EPQS 122.23.17 LL;
  • on your own - GAMA 300 G3B.
1
  • Feasibility study design;
  • Development of the design documentation;
  • Supply of solar panels and inverter equipment;
  • Supply of power and switchboard equipment;
  • Construction and installation works;
  • Connection of the constructed SPS to the grid;
  • Member registration in WEM and “green” tariff approval;
  • Service maintenance of SPS.
2

35 kV AC power supply:

  • Vacuum switch 35 kV OVB-VBF 40.25.32 2500 A (ABB);
  • 1000 A triple-pole disconnectors (Electrical protection service);
  • surge arresters - BOW-OCP2-41M-NFF, 35kV (2 class);
  • 335 kV CEF fuses - S 30 / 40.5 kV (ABB);
  • 35 kV current transformers TRO-70.11 (ABB);
  • 35 kV TJO 7 (ABB) voltage transformers.

 

0.4 kV AC power supply:

  • automatic air switch IZMX40B3-V32W-1 3200A 85kA (EATON);
  • surge suppressors - ETITEC A 280/5 / C-NO (5kA, 8/20);
  • EBV 2 400A (EATON) fuse disconnector;
  • NH 1 280A (ETI) fuses.
3

When operating a solar power plant:
• the conditions and operating requirements of the equipment provided by its manufacturers in the relevant instructions must be observed;
• Before switching on the equipment, make sure that it is not mechanically damaged;
• it is advisable to periodically perform maintenance work on the equipment as recommended by its manufacturer;
• Appropriate safety measures must be followed.

4
SPP "Sun Energy Mezhirich"
Review of SUN ENERGY LLC on the implementation of a complex of construction and installation works for the construction of a solar power plant with a capacity of 2 MW.
5
Video
Want to build a similar project, but don't know where to start? Request a manager consultation
or
Fill out the brief
Customer profile
Industrial Solar Power
placement:
Services you need:
Order project