Installation of cable lines for wind farm "Sivash"
EDS_stroit_Sivash_2-ochered_1
EDS_stroit_Sivash_2-ochered_7
EDS_stroit_Sivash_2-ochered_6
Sivash_may_6
Sivash_may_1
кабельная линия вэс сиваш
Sivash_may_3
Sivash_may_4
Sivash_may_7
EDS_stroit_Sivash_2-ochered_1
EDS_stroit_Sivash_2-ochered_7
EDS_stroit_Sivash_2-ochered_6
Sivash_may_6
Sivash_may_1
кабельная линия вэс сиваш
Sivash_may_3
Sivash_may_4
Sivash_may_7

Installation of cable lines for wind farm "Sivash"

0 Technical
features
1 Type of
works
0
  • 150 km of cable lines;
  • 500 km of cable of XLPE;
  • 170 km of fiber-optic communication lines of a high degree of protection.
1
  • Laying of power cable power supply lines;
  • Laying of fiber optic cable;
  • Installation of coupling of a power cable;
  • Wire connections and test fiber optic cable in wind power plants (wind turbines);
  • Tests of the transformer 330 kV substation, which will feed the future Sivashskaya vehs;

Want to build a similar project, but don't know where to start? Request a manager consultation
or
Fill out the brief
Customer profile
Products/Services
1. Industrial Solar Power
placement:
Services you need:
2. Electrical substations
Reconstruction:
3. Switchboard equipment
Solutions for:
Order project