Reconstruction of the cable line «Lider»
Technical
features
features
Type of
works
works
- The length of the route : 2151 m
- Development of the trench;
- Dismantling of asphalt pavement roads;
- Cable laying;
- Laying pipe in the trench;
- The cable is connected to the contact bus of the installation;
- Installing the terminal and connecting couplings;
- Final landscaping;
- Installation of current transformer and surge arrester.
All work involving machinery from our own fleet performs skilled and well-equipped brigade E-Cable, the specialization of which underground cable lines.
Appointment
- Technical re-equipment of cable lines KL-6 kV voltage with dispatch control of the SS "PLM 13 – RP the leader of the 17".