Reconstruction of electrical substations 150/35/10/3,3 kW «Fedorovka»

Power: 150/35/10 / 3.3 kV
0 Technical
features
1 Type of
works
2 Reviews
0
  • A set of works on the installation of equipment and specialized software (SCADA system) was completed, which provide the ability to receive and transmit information from the substation (SS) to the control center.
1

Reconstruction of the outdoor switchgear 150 kV:

  • replacement of switches At-220 on gas-insulated counterparts ABB (one of the leading manufacturers of electrical equipment);
  • increase the safety and quality of operation of the substation by mounting six surge arresters 150 kV.

Reconstruction of the outdoor switchgear 35 kV:

  • installation teams conducted three replacement oil circuit breakers, vacuum counterparts in the switchgear 35 kV;
  • installation teams conducted three replacement oil circuit breakers, vacuum counterparts in the switchgear 35 kV;

Reconstruction of indoor switchgear 10 kV:

  • replacement of three low-oil circuit breakers with vacuum;
  • installation of nine modern current transformers.


Tele-mechanization was fulfilled of SS:
The complex of works on installation of equipment and software (SCADA system), which enable transmission and reception of information from the substations (SS) to the control room.

2
Transformer substation «Fedorovka»
Review of AT "UKRAINIAN RAILWAY" Regional branch "PRIDNEPROVSKAYA RAILWAY" on the reconstruction of traction substation "Fedorovka"