SPS 2 MW «Sun Energy»
Power:
2 MW
Area:
4.86 ha
The construction period: 02.2017 - 06.2017
Start generated: 06.2019
Technical
features
features
Type of
works
works
System
protection
protection
Conditions
operation
operation
Reviews
Video
- Installed capacity of photovoltaic modules — 2,16 MW;
- Inverter capacity of station – 2,0 MW;
- The volume of annual electricity generation is 2454 MW/year;
- CO2 reduction – 1702 tons;
- Number of “Jinko” photovoltaic modules (PV modules) – 8000 pcs. with a capacity of 270 W;
- Number of «SMA-25» inverters – 80 pcs. 25 kW each;
- Number of «SMA-10» inverters – 10 pcs. 200 kW each;
- Complete transformer substation 1000/6/0,4 – 2 pcs.
Appointment:
- Conversion of solar energy to ~ 6000 V, 50 Hz electric power and its transmission to the electricity grid to other consumers.
Accounting for electricity:
Bidirectional counter:
- on generation networks - EPQS 122.23.17 LL;
- on your own - GAMA 300 G3B.
- Development of the design documentation;
- Supply of power and switchboard equipment;
- Construction and installation works;
- Connection of the constructed SPS to the grid;
- Member registration in WEM and “green” tariff approval;
- Service maintenance of SPS.
0,4 kV AC power supply:
- 0.4 kV input switch - LZMN4-AE1600 1600 F (EATON);
- surge suppressors - ETITEC B 320 / 12,5 F (ETI).
6 kV AC power supply:
- vacuum switch BB / TEL-10/630 (Tavrida Electric);
- load switches BHA-10/630;
- surge suppressors - OPN-KR / TEL-6 / 7.2 kV.
When operating a solar power plant:
- the conditions and operating requirements of the equipment provided by its manufacturers in the relevant instructions must be observed;
- Before switching on the equipment, make sure that it is not mechanically damaged;
- it is advisable to periodically perform maintenance work on the equipment as recommended by its manufacturer;
- Appropriate safety measures must be followed.