Power: 19,9 MW
Area: 36 ha
The construction period: 01.2019 - 01.2019
Start generated: 04.2019
0 Technical
features
1 Type of
works
2 System
protection
3 Conditions
operation
4 Reviews
0
  • Installed capacity of photovoltaic modules — 22,97 MW;
  • Inverter capacity of station – 19,9 MW;
  • The volume of annual electricity generation is 29986 MW/year;
  • CO2 reduction – 17322 tons;
  • The number of «Risen» photovoltaic modules (PV modules) – 27812 pcs. with a capacity of 340 W;
  • The number of «Risen» photovoltaic modules (PV modules) – 39712 pcs. with a capacity of 345 W;
  • The number of «АВВ - PVS-120-TL» inverters – 165 pcs. 120 kW each;
  • The number of «АВВ - TRIO-TM-60.0-480» inverters – 1 pcs. 100 kW;
  • The number of transformer 2000/35 / 0,4 - 11 pcs.
  • The number of distribution points RP- 1 pcs. x 35 kW
  • The number of load-bearing metal structures - 1987 pcs.

 

Appointment:

  • Conversion of solar energy to ~ 35000 V, 50 Hz electric power and its transmission to the electricity grid to other consumers.

 

Accounting for electricity:

Bidirectional counter:

  • on generation networks - SL 7000;
  • on your own - GAMA 3000 GЗВ.
1
  • Feasibility study design;
  • Development of the design documentation;
  • Supply of solar panels and inverter equipment;
  • Supply of power and switchboard equipment;
  • Construction and installation works;
  • Connection of the constructed SPS to the grid;
  • Member registration in WEM and “green” tariff approval;
  • Service maintenance of SPS.
2

0.4 kV AC power supply:

  • automatic air switch 3200А 85кА, ЕР 332 S Зр (EТІ);
  • ARS-2-6-M fuse disconnector (APATOR);
  • NH 1 gG (gL) 224 A (ETI) fuses.
  • surge suppressors ETITEC A 500/10 / A-NO (ЕТІ).

 

35 kV AC power supply:

  • vacuum switch 35 кВ OVB-VBF 40,5 2500 A (ABB);
  • РГП1000 А triple-pole disconnectors;
  • surge suppressors - AZC491 (Sicame);
  • 35 kV CEF S 30 / 40,5 63 А fuses (АВВ).
  • 35 кВ ТРО-70.11 current transformers (ABB);
  • voltage transformers 35 кВ ТJO 7 (АВВ).
3

When operating a solar power plant:

  • the conditions and operating requirements of the equipment provided by its manufacturers in the relevant instructions must be observed;
  • Before switching on the equipment, make sure that it is not mechanically damaged;
  • it is advisable to periodically perform maintenance work on the equipment as recommended by its manufacturer;
  • Appropriate safety measures must be followed.
4
SPP «Shirokoe Solar Park»
Review of "WIDE SOLAR PARK" on the implementation of the construction of solar power capacity of 19.9 MW.
Want to build a similar project, but don't know where to start? Request a manager consultation
or
Fill out the brief
Order project