• Directions
    • Electrical substations
    • Cable lines
    • Industrial solar power station
    • SPP for your personal needs
    • ETL-laboratory
    • Service SES
  • Turnkey solutions
  • Projects
  • Press center
    • Press kit
  • Contacts
    • About the company
    • Reviews
    • Catalogs and reference sheets
    • Career
    • Jobs
    • Contacts
  • HOLDING
+38 056 731-95-75
  • Ua
  • /
  • Ru
  • /
  • En
  • Ua
  • /
  • Ru
  • /
  • En
  • Directions
  • Electrical substations
  • Cable lines
  • Industrial solar power station
  • SPP for your personal needs
  • ETL-laboratory
  • Service SES
  • Projects
  • Сonstruction of substation 35/10 KW «Teplichnaya»
  • Reconstruction of electrical substations ST «Topol» 150/10 kV
  • Reconstruction of 35/10 kW substation «Yaduty»
  • Reconstruction of 35/10 kW substation «Patyuty»
  • Reconstruction of the cable line Frunzenskiy housing estate
  • Reconstruction of electrical substations 35/10 kW «Holovenky»
  • All projects
  • Company
  • Contacts
  • Press center
  • HOLDING
  • Press center
  • Press kit
Main
Latest news
19/07 EDS GROUP COLLECTIVE VACCINATION 19/05 Technical reconstruction of 110/35/6 kv “NOVORAISKAIA” SS 14/04 “GENEVE” residential complex. 2nd stage of reliable power supply from EDS
Most viewed
27/07 +19.5 MW in the Zaporizhia oblast. SPS MALAYA BELOZERKA-2 is completed 14/07 What will happen next. Opinion Of Alexander Zapishniy 13/05 Chinese investments. SPS 9.99 mw is commissioned in Cherkasy Oblast

ЭТЛ в деле

29/04/2020
Directions
  • Electrical substations
  • Cable lines
  • Industrial solar power station
  • Construction of solar power plants for your personal needs for business
  • ETL-laboratory
  • Service SES
Projects
  • Reconstruction of electrical substations 150/35/10/3,3 kW «Fedorovka»
  • Reconstruction of the cable line «Lider»
  • THE POWER SUPPLY OF LCD PIXEL
  • Construction of substation 330/35 kV "Nadezhdino"
  • Installation of cable lines for wind farm "Sivash"
Company
  • Contacts
  • Press center
Electrical laboratory: checking insulation resistance
SPP connection procedure in UKRAINE
We design and implement
Start your career at EDS-ENGINEERING!
EDS destroys myths
WORKS ON POWER SUPPLY OF THE PIXEL PLAZA RE ARE COMPLETED
STREAMLINE GOES TO MYKOLAIV
SELAM, ANKARA. EDS-ENGINEERING ON TURKISH EIF FORUM
We are reconstructing the 150/6 KV SS for YUZHNIY GOK (South Mountain Concentrating Combine)
PLUS TWO CABLE LINES IN DNIPRO
"Bolshaya Мedveditsa" is to be!
What will happen next. Opinion Of Alexander Zapishniy
+19.5 MW in the Zaporizhia oblast. SPS MALAYA BELOZERKA-2 is completed
We are proud of cooperation
IN NEW YEAR WITH NEW SPP. LYBID 5.1 MW COMPLETED
Reliability and safety. EDS renewed the supports and mounted the reclosers
UNFREEZING. EDS IS BUILDING A NEW LARGE SPS
WE HAVE RECONSTRUCTED THE 150/6 KV SS FOR SOUTH MOUNTAIN CONCENTRATING COMBINE
IN THE DNIPRO POLYTECHNIC NTU AN EDUCATIONAL LABORATORY WAS OFFICIALLY OPENED WITH THE SUPPORT OF THE EDS
EDS COMPLETED THE RECONSTRUCTION OF THE 35/6 KV SS SEVERNAYA
DESIGNER OF SPP # 1 IN UKRAINE
WE RECONSTRUCT A CABLE LINE IN DNIPRO
We construct
Done. EDS repaired the roof of the school in the area of presence
We manufacture equipment
EDS rocks. Introducing equipment at the price of a supercar
New life of SS «MAR'YANSKAYA» 35/6 kV
On the SEF & CISOLAR sunny fields
Round 2. New SPP in Mala Bilozerka
EDS at INTERFAX-UKRAINE press conference
«SIVASH» facility. Second stage is started
EDS successfully passed ISO 9001: 2015 supervision audit
SPP Zhdanovka 7 MW is completed
Equipment is eager for battle
SS LIDER. Laying the cable line
Grand opening of a new SPP in Dnipro region
A bit of magicians. EDS group helped the orphaned children
SS «NADEZHDINO» 330/35 KV. At the finish line
Delivered to the customer another 10-megawatt in Zaporizhia region
Kherson Sun began to shine. SPP Aleksandrovka 8.19 MW is built
Reconstruction of RP-8 in Donetsk region is completed
Reconstruction of Electrical substation 35/6 KV Maryanskaya is finished
We see the prospect. EDS lit the alley in Dnipro
Chinese investments. SPS 9.99 mw is commissioned in Cherkasy Oblast
Bon voyage! Transformer substations of module series are on the way to the customer
High voltage-2. EDS is building an electric substation in Odessa region
The client trusted us —we increased the capacity
Done! SS «MAR'YANSKAYA»35/6 kv is reconstructed
New addition to the Zaporizhia solar generation
We are changing the energetics. The “Donetsk four”: the beginning
How it was. Fragments of 110/35 kv “YUZHNE ENERGY” SS construction
“GENEVE” residential complex. 2nd stage of reliable power supply from EDS
Technical reconstruction of 110/35/6 kv “NOVORAISKAIA” SS
EDS GROUP COLLECTIVE VACCINATION
  • Contacts
  • ul Verkhoyanskaya 49
  • Dnepropetrovsk, Ukraine, 49049
  • +38 056 731-95-75
  • e-mail: info@eds-ltd.com.ua
Press center
  • Press kit
Electrical laboratory: checking insulation resistance
SPP connection procedure in UKRAINE
We design and implement
Start your career at EDS-ENGINEERING!
EDS destroys myths
WORKS ON POWER SUPPLY OF THE PIXEL PLAZA RE ARE COMPLETED
STREAMLINE GOES TO MYKOLAIV
We are reconstructing the 150/6 KV SS for YUZHNIY GOK (South Mountain Concentrating Combine)
SELAM, ANKARA. EDS-ENGINEERING ON TURKISH EIF FORUM
PLUS TWO CABLE LINES IN DNIPRO
"Bolshaya Мedveditsa" is to be!
What will happen next. Opinion Of Alexander Zapishniy
+19.5 MW in the Zaporizhia oblast. SPS MALAYA BELOZERKA-2 is completed
We are proud of cooperation
IN NEW YEAR WITH NEW SPP. LYBID 5.1 MW COMPLETED
Reliability and safety. EDS renewed the supports and mounted the reclosers
UNFREEZING. EDS IS BUILDING A NEW LARGE SPS
WE HAVE RECONSTRUCTED THE 150/6 KV SS FOR SOUTH MOUNTAIN CONCENTRATING COMBINE
IN THE DNIPRO POLYTECHNIC NTU AN EDUCATIONAL LABORATORY WAS OFFICIALLY OPENED WITH THE SUPPORT OF THE EDS
EDS COMPLETED THE RECONSTRUCTION OF THE 35/6 KV SS SEVERNAYA
DESIGNER OF SPP # 1 IN UKRAINE
WE RECONSTRUCT A CABLE LINE IN DNIPRO
We construct
Done. EDS repaired the roof of the school in the area of presence
We manufacture equipment
EDS rocks. Introducing equipment at the price of a supercar
On the SEF & CISOLAR sunny fields
New life of SS «MAR'YANSKAYA» 35/6 kV
Round 2. New SPP in Mala Bilozerka
EDS at INTERFAX-UKRAINE press conference
EDS successfully passed ISO 9001: 2015 supervision audit
«SIVASH» facility. Second stage is started
SPP Zhdanovka 7 MW is completed
Equipment is eager for battle
SS LIDER. Laying the cable line
Grand opening of a new SPP in Dnipro region
A bit of magicians. EDS group helped the orphaned children
Delivered to the customer another 10-megawatt in Zaporizhia region
SS «NADEZHDINO» 330/35 KV. At the finish line
Reconstruction of RP-8 in Donetsk region is completed
Kherson Sun began to shine. SPP Aleksandrovka 8.19 MW is built
Reconstruction of Electrical substation 35/6 KV Maryanskaya is finished
We see the prospect. EDS lit the alley in Dnipro
Bon voyage! Transformer substations of module series are on the way to the customer
Chinese investments. SPS 9.99 mw is commissioned in Cherkasy Oblast
High voltage-2. EDS is building an electric substation in Odessa region
The client trusted us —we increased the capacity
Done! SS «MAR'YANSKAYA»35/6 kv is reconstructed
New addition to the Zaporizhia solar generation
We are changing the energetics. The “Donetsk four”: the beginning
How it was. Fragments of 110/35 kv “YUZHNE ENERGY” SS construction
“GENEVE” residential complex. 2nd stage of reliable power supply from EDS
Technical reconstruction of 110/35/6 kv “NOVORAISKAIA” SS
EDS GROUP COLLECTIVE VACCINATION
Up
© 2010-2022 EDS Engineering
Consent to the processing of personal data Privacy policy