WE RECONSTRUCT A CABLE LINE IN DNIPRO
Installation engineers of the specialized EDS E-Cable team are reconstructing a 0.4 kV cable line in the city of Dnipro - from a transformer substation (TP-718) to the trauma department of city hospital No. 2, and then to a residential building.
500 m - length of the trench
1133 m - length of the laid cable
70,120 and 240 mm - cross-section of low-voltage cables
Up to 20 working days - period of work execution
Up to 40% of the works are carried out manually.
Despite the fact that the reconstruction is carried out in a residential area, a mesh fence has been placed throughout the all working area - for the safety of pedestrians.
In some places there are reinforced concrete layers, which the team's specialists stumbled upon and now it will be necessary to crush them with a pneumatic jackhammer.
We are responsible for the integrity of buildings and green spaces, so all large ones are dug round by hand to prevent subsidence of soil or asphalt.