Reconstruction of RP-8 in Donetsk region is completed
11/01/2021
The EDS team completed the technical reconstruction in the city of Kostyantynivka, Donetsk oblast, at the 6 / 0.4 kV distribution point RP-8.
As for the technical specifications:
- The number of ShchO-90 cells for replacement – 9 pcs;
- The number of KSO-272 cells – 22 pcs;
- Power transformer - 630 kVA – 2 pcs.
- The following types of work were performed on the electrical part:
- Disassembly of old equipment;
- Replacement and busbar arrangement of power transformers;
- Replacement of ShchO-90 low-voltage cells, KSO-272 high-voltage cells;
- Commissioning works of all equipment, including RZiA (relay protection and automation);
- Installation of lighting, electric heating, burglar alarms;
- Installation of grounding and lightning protection systems.
The peculiarity of this facility lies in the limited space inside the RP (distribution point), which required a clear planning of the sequence and a high level of organization of the work being carried out, with which EDS coped perfectly, as a result the work was performed efficiently and in due time.