Main
/
News
/
Reconstruction of RP-8 in Donetsk region is completed

Reconstruction of RP-8 in Donetsk region is completed

11/01/2021

The EDS team completed the technical reconstruction in the city of Kostyantynivka, Donetsk oblast, at the 6 / 0.4 kV distribution point RP-8.

As for the technical specifications:

  • The number of ShchO-90 cells for replacement – 9 pcs;
  • The number of KSO-272 cells – 22 pcs;
  • Power transformer - 630 kVA – 2 pcs.
  • The following types of work were performed on the electrical part:
  • Disassembly of old equipment;
  • Replacement and busbar arrangement of power transformers;
  • Replacement of ShchO-90 low-voltage cells, KSO-272 high-voltage cells;
  • Commissioning works of all equipment, including RZiA (relay protection and automation);
  • Installation of lighting, electric heating, burglar alarms;
  • Installation of grounding and lightning protection systems.

The peculiarity of this facility lies in the limited space inside the RP (distribution point), which required a clear planning of the sequence and a high level of organization of the work being carried out, with which EDS coped perfectly, as a result the work was performed efficiently and in due time.