Reconstruction of the cable line in village Dijevka
Start generated: 10.2018
Technical
features
features
Type of
works
works
Video
Length of strip lines: 346,9 m
- For laying KL underground chose cable Apvegap – 12/20 section 3 (1х300/70). Reinforced outer sheath of cross-linked polyethylene and sealing of the screen (marked "ha") allow you to exploit the power cable in the soil with high humidity.
- All stages of reconstruction completed on time in accordance with the requirements of SNiP, PUE.
