Reconstruction of the cable line for DTEK
Technical
features
features
Type of
works
works
Length of strip lines: 5292 m
- Digging a trench with a depth of 0.9-1 m length 200 m;
- The sand cushion under the cable with a thickness of 150 mm;
- Cable laying in the trench;
- Backfilling of cable sand;
- Laying protective layer of bricks;
- Measurements of the integrity of the cable insulation;
- Carried out incoming inspection of cable and wire products in the presence of
- The customer with the results of test reports;
- Pre-commissioning activities.
All the work was done in strict compliance with the PUE requirements for laying cable in the trench.
Replace section of CL was carried out between transformer substations (TP) No. 1536 — 1540. The project envisages laying of cable line cable brand Apvegap 1х120/35, produced by PJSC "PLANT YUZHKABEL", which is designed for operation voltage up to 15 kV. New KL was laid to replace the old, which was built over 30 years ago.