Main
/
Projects
/
Reconstruction of the cable line for DTEK
Dnepr_kabelnaya liniya dlya DTEK_2
Dnepr_kabelnaya liniya dlya DTEK_4
Dnepr_kabelnaya liniya dlya DTEK_8
Dnepr_kabelnaya liniya dlya DTEK_7
кабельная линия для ДТЭК
КАБЕЛЬ 7
Dnepr_kabelnaya liniya dlya DTEK_2
Dnepr_kabelnaya liniya dlya DTEK_4
Dnepr_kabelnaya liniya dlya DTEK_8
Dnepr_kabelnaya liniya dlya DTEK_7
кабельная линия для ДТЭК
КАБЕЛЬ 7

Reconstruction of the cable line for DTEK

0 Technical
features
1 Type of
works
0

Length of strip lines: 5292 m

1
  • Digging a trench with a depth of 0.9-1 m length 200 m;
  • The sand cushion under the cable with a thickness of 150 mm;
  • Cable laying in the trench;
  • Backfilling of cable sand;
  • Laying protective layer of bricks;
  • Measurements of the integrity of the cable insulation;
  • Carried out incoming inspection of cable and wire products in the presence of
  • The customer with the results of test reports;
  • Pre-commissioning activities.

All the work was done in strict compliance with the PUE requirements for laying cable in the trench.

Replace section of CL was carried out between transformer substations (TP) No. 1536 — 1540. The project envisages laying of cable line cable brand Apvegap 1х120/35, produced by PJSC "PLANT YUZHKABEL", which is designed for operation voltage up to 15 kV. New KL was laid to replace the old, which was built over 30 years ago.