Greenhouse plant power supply system modernization
КАБЕЛЬ4
электроснабжение тепличный комбинат днипро
DSC06792
DSC06776
DSC06774
КАБЕЛЬ4
электроснабжение тепличный комбинат днипро
DSC06792
DSC06776
DSC06774

Greenhouse plant power supply system modernization

0 Technical
features
1 Type of
works
2 Video
0
  • Length of strip lines: 5292 m;
  • Underground line: 4491 m;
  • Air line: 801 m
1

Installed :

  • 20 supports - СВ105-5;
  • 9 supports - СК105-10;
  • 14 racks - USO-5A;
  • MODULE KTP-630;
  • RU-10 kV series MVC-10;
  • RU 0,4 kV of the StreamLine;

 

  • Arrangement of sand bags;
  • The conducted works on installation of cable trenches;
  • Laying of warning tape;
  • Supply and commissioning of packaged transformer substation with two transformers with capacity of 630 kVA with a partition scheme for the high voltage.;
  • Installation 8 KTP -1000 on the Foundation;
  • For additional protection of the cable on the track produced pipe PE 90 in the area of route length of more than 1000 m;
  • Installation of an 8-power transformer of type TMG-1000/10.