- Type of Construction: Ballast system, oriented towards the south
- Solar Panels: 1170 Jinko Solar modules, 550 W each
- Inverters: 5 Huawei Sun2000-100 inverters, 100 kW each
- Generation Distribution: 200 kW supplied to the first transformer substation (TP), 300 kW to the second.
Solar Power Plant for NOVUS Logistics Center
Project Overview
The solar power plant with a capacity of 500 kW (DC 643.5 kW) provides the NOVUS logistics center with green energy, optimizing energy consumption and reducing electricity costs.
The main load of the logistics center includes refrigeration units, air conditioning systems, ventilation systems, lighting for warehouses and office premises, and automated sorting and transportation lines. Due to the high proportion of energy consumption during the day, the energy produced by the solar plant can be used as efficiently as possible.
This system reduces dependence on external electricity suppliers and ensures stable power supply to the facility through its own generation.
The solar power station promotes the ecological development of the company and meets modern ESG requirements.
Intelligent Control System
- Automatic Control System (ACS): Equipped with an uninterruptible power supply (UPS), ensuring continuous operation of the monitoring system even during power outages.
- Monitoring System: Based on Fusion Solar and Encombi, it allows real-time control of the solar power plant’s operation.
- Encombi Integration: Ensures integration with generator sets (GPU).