Substation 110/35 kV "Uhznoe Energy" for a wind power plant 72 MW
works
Construction of SS 110/35 kV "Uhznoe Energy" for wind power plant 72 MW
A full range of construction, installation and commissioning works, starting from geodetic surveys and "zero cycle", to commissioning of the facility on a turnkey basis, namely:
• geological and geodetic surveys;
• earthworks (dredging and transportation of soil);
• construction and installation works (concrete-monolithic works, installation of reinforced concrete structures, manufacturing, assembly and installation of metal structures, aerated concrete and brick masonry, interior and exterior decoration, installation of hinged facades, etc.);
• installation of cable ducts;
• installation of electrical and cable products;
• installation of power lines
• installation of main and auxiliary power and electrical equipment (with voltage class up to 110 kV);
• manufacturing and installation of cabinets and systems of secondary and relay-protective circuits;
• carrying out high-voltage tests by an electrical laboratory with the issuance protocols of the established sample;
• busbar and installation of high-voltage power lines;
• commissioning work on high-voltage equipment and switching devices (with voltage class up to 330 kV);
• installation of power and measuring transformers;
• manufacturing, installation and debugging of automatic control and accounting systems energy resources (ACASER) from the first level - primary sensors for collecting signals and information for setting up and visualizing processes at the top level systems;
• manufacturing, installation and debugging of automatic control systems for technological process (including system debugging and commissioning);
• carrying out acceptance tests and putting the facility into operation.