  • On the 10 kV side BB / TEL 10 kV vacuum circuit breaker manufactured by Tavrida Electric Ukraine has been installed, and producing two current transformer 10 kV Beontop and display system kit KUVAG production voltage;
  • The technical re-equipment of the L-45 cell of the switchgear RP 10 kV was completed, a solar power station with a capacity of 3.5 MW is connected to the L-45 power transmission line;
  • The whole complex of works on setting up relay protection and automation systems has been completed.