Reconstruction of outdated equipment for substation «Liteinaia»

Power: 150 kV
0 Type of
works
1 Reviews
2 Video
0
Type of
works
  • Replacement of 8 disconnectors RNDZ-220, RNG-220 with the possibility of remote control from the control room has been carried out;
  • Laying a control cable longer than 19 km.
  • Commissioning and high-voltage tests using our own mobile laboratory ETL-35K;
  • Installation of a new tray system of precast concrete.

 