Main
/
Projects
/
SPS 5,1 MW «Lybid»
солнечная электростанция лыбидь
seslybidno
seslybidnovo
солнечная электростанция лыбидь
seslybidno
seslybidnovo

SPS 5,1 MW «Lybid»

Power: 5,1 MW
Area: 8 hа
0 Technical
features
1 Type of
works
2 System
protection
3 Conditions
operation
4 Reviews
0
  • Installed capacity of photovoltaic modules — 5,7 MW;
  • Inverter capacity of station – 5,1 MW;
  • The volume of annual electricity generation is 2454 MW/year;
  • CO2 reduction – 1702 tons;
  • The number of " HT Solar Energy" photovoltaic modules (PV modules) – 17328 pcs. with a capacity of 330 W;
  • The number of SUN2000-60KTL inverters – 85 pcs. 60 kW each;
  • The number of transformer - 3 pcs.
  • The number of distribution points RP- 1 pcs. x 35 kW

 

Appointment:

Conversion of solar energy to ~ 35000 V, 50 Hz electric power and its transmission to the electricity grid to other consumers.

 

Accounting for electricity:

Bidirectional counter:

  • on generation networks - SL 7000 ;
  • on your own - GAMMA 300.
1
  • Feasibility study design;
  • Development of the design documentation;
  • Supply of solar panels and inverter equipment;
  • Supply of power and switchboard equipment;
  • Construction and installation works;
  • Connection of the constructed SPS to the grid;
  • Member registration in WEM and “green” tariff approval;
  • Service maintenance of SPS.
2

0.4 kV AC power supply:

  • automatic switch - 3200 А 85кА, ЕР 332S Зр (EТІ);
  • ARS-2-6-M fuse disconnectors (APATOR);
  • NH 1 gG(gL) 224 A fuses (ETI) ;
  • ETITEC A 500/10/A-NO surge suppressors (ETI).

 

35 kV AC power supply:

  • 35 кV VBF 40.20 2500 A vacuum switch (ABB);
  • 35/1000 triple-pole disconnectors;
  • HAD-41M-NFF surge suppressors;
  • 35 kV СEF - S 30/40,5 fuses (АВВ);
  • 35 кV ТРО-70.11 current transformers (АВВ);
  • 35 кV ТJO 7 voltage transformers (ABB).
3

When operating a solar power plant:

  • the conditions and operating requirements of the equipment provided by its manufacturers in the relevant instructions must be observed;
  • Before switching on the equipment, make sure that it is not mechanically damaged;
  • it is advisable to periodically perform maintenance work on the equipment as recommended by its manufacturer;
  • Appropriate safety measures must be followed.
4
SPP "Lybid"
Review of "LYBID Development" on the implementation of a range of construction and installation work on the construction of a solar power plant with capacity of 2 MW.
Want to build a similar project, but don't know where to start? Request a manager consultation
or
Fill out the brief
Order project