SPS 5,1 MW «Lybid»
Power:
5,1 MW
Area:
8 hа
Technical
features
features
Type of
works
works
System
protection
protection
Conditions
operation
operation
Reviews
- Installed capacity of photovoltaic modules — 5,7 MW;
- Inverter capacity of station – 5,1 MW;
- The volume of annual electricity generation is 2454 MW/year;
- CO2 reduction – 1702 tons;
- The number of " HT Solar Energy" photovoltaic modules (PV modules) – 17328 pcs. with a capacity of 330 W;
- The number of SUN2000-60KTL inverters – 85 pcs. 60 kW each;
- The number of transformer - 3 pcs.
- The number of distribution points RP- 1 pcs. x 35 kW
Appointment:
Conversion of solar energy to ~ 35000 V, 50 Hz electric power and its transmission to the electricity grid to other consumers.
Accounting for electricity:
Bidirectional counter:
- on generation networks - SL 7000 ;
- on your own - GAMMA 300.
- Feasibility study design;
- Development of the design documentation;
- Supply of solar panels and inverter equipment;
- Supply of power and switchboard equipment;
- Construction and installation works;
- Connection of the constructed SPS to the grid;
- Member registration in WEM and “green” tariff approval;
- Service maintenance of SPS.
0.4 kV AC power supply:
- automatic switch - 3200 А 85кА, ЕР 332S Зр (EТІ);
- ARS-2-6-M fuse disconnectors (APATOR);
- NH 1 gG(gL) 224 A fuses (ETI) ;
- ETITEC A 500/10/A-NO surge suppressors (ETI).
35 kV AC power supply:
- 35 кV VBF 40.20 2500 A vacuum switch (ABB);
- 35/1000 triple-pole disconnectors;
- HAD-41M-NFF surge suppressors;
- 35 kV СEF - S 30/40,5 fuses (АВВ);
- 35 кV ТРО-70.11 current transformers (АВВ);
- 35 кV ТJO 7 voltage transformers (ABB).
When operating a solar power plant:
- the conditions and operating requirements of the equipment provided by its manufacturers in the relevant instructions must be observed;
- Before switching on the equipment, make sure that it is not mechanically damaged;
- it is advisable to periodically perform maintenance work on the equipment as recommended by its manufacturer;
- Appropriate safety measures must be followed.