Power: 3,9 MW
Area: 8,7 ha
0 Technical
features
1 Type of
works
2 System
protection
3 Conditions
operation
4 Reviews
5 Video
0
  • Installed capacity of photovoltaic modules — 4,45 MW;
  • Inverter capacity of station – 3,89 MW;
  • The volume of annual electricity generation is 5703 MW/year;
  • CO2 reduction – 3296 tons;
  • The number of «TALESUN» photovoltaic modules (PV modules) – 13680 pcs. with a capacity of 325 W;
  • The number of «FRONIUS ECO» inverters – 144 pcs. with a capacity of 27 kW each;
  • The number of transformer КТП 630/6/0,4 - 7 pcs.
  • The number of load-bearing metal structures - 360 pcs.

 

Appointment:

  • Conversion of solar energy to ~ 6000 V, 50 Hz electric power and its transmission to the electricity grid to other consumers.
1
  • Feasibility study design;
  • Development of the design documentation;
  • Supply of solar panels and inverter equipment;
  • Supply of power and switchboard equipment;
  • Construction and installation works;
  • Connection of the constructed SPS to the grid;
  • Member registration in WEM and “green” tariff approval;
  • Service maintenance of SPS.
2

6 kV AC power supply:

  • automatic switch IZMX 16 (Eaton);
  • surge suppressors - ETITEC A 500/5 (ETI); ПЛЗ ASIC 150C (Sicame);
  • ARS 2 PRO fuse disconnector (APATOR);
  • triple-pole disconnectors - РЛНДЗ - 10/400 У1;
  • NH 2C fuses (ЕТI);
  • current transformers ТОЛУ- 102.3 Г2 - 05S (BEONTOP)
  • voltage transformers НТМИ-1-6.
3

When operating a solar power plant:

  •  the conditions and operating requirements of the equipment provided by its manufacturers in the relevant instructions must be observed;
  • Before switching on the equipment, make sure that it is not mechanically damaged;
  • it is advisable to periodically perform maintenance work on the equipment as recommended by its manufacturer;
  • Appropriate safety measures must be followed.
4
SPP "Merefa"
Review of "Alternative Energy Solar Sorses" on a range of construction and installation work on the construction of a solar power plant of 3.9 MW.
5
Video
Want to build a similar project, but don't know where to start? Request a manager consultation
or
Fill out the brief
Would you like to receive a quote?
Order project