SES "ROZUMIVKA"

Power: 4 MW
Area: 8 hectares
Start generated: 11.2019
0 Technical
features
1 Type of
works
2 System
protection
3 Conditions
operation
0
  • The installed capacity of PV modules— of 5.24 MW;
  • Inverter the power station— 4 MW;
  • The volume of annual generation of electricity— 6362 MW/year;
  • Reduction of CO2— 3362,6 tons;
  • The number and capacity of polycrystalline solar panels "Risen" - 15200 PCs x 345 W;
  • The number and power inverters "ABB - PVS-120-TL" — 33 PCs. x 120 kW;
  • The number of transformer substations 2000 kVA and 2500 kVA 0,48/10 kV;
  • Number of transformer substations - 1000/10/0,4 - 2;
  • The number of load-bearing steel structures 38
  • The number of distribution substations of 10 kV DP - 1 PC.

 

Appointment

  • The conversion of solar energy into electrical energy ~ 35000 watts, 50 Hz and its transmission in the power grid to other consumers.

Metering

A bidirectional counter:

  • on the networking generation – ACTARIS SL7000 5(10)A;
  • for my own needs – ACTARIS SL7000 5(10)A;
1
  • Feasibility study (FS);
  • Development of project documentation;
  • Supply of solar panels and inverter equipment;
  • Supply of power and electrical equipment;
  • Construction and installation works;
  • Connection built SES to the network;
  • Registration of membership in the wholesale electricity market and approving "green" tariff;
  • Service SES.
2

The AC network 0.4 kV:

  • automatic air circuit breaker 630A, BB / TEL-10 / 630A;
  • fuse disconnectors ARS 2-6-M;

AC: 10 kV:

  • vacuum circuit breaker BB/TEL-10-20/630;
  • surge arresters - surge arresters -KP/TEL-6/7,2 UHL2 ;
  • the VVC 2АПКН fuses 12kV 10 kV;
  • transformers of current TOLU-10 0.5 S/0.5/10P;
  • voltage transformers - IVS-10.
3

In the operation of solar power plants:

  • you must comply with the conditions and requirements for operation of equipment provided by manufacturers in the relevant instructions;
  • before switching on the equipment, you must ensure in absence of mechanical damages;
  • it is advisable to periodically carry out maintenance according to the recommendations of its manufacturer;
  • it is necessary to strictly comply with the relevant security measures.