Сonstruction of substation 35/10 KW «Teplichnaya»
подстанция тепличная
teplichnayanovo
teplichnayanovos
teplichnayanovost
teplichnayanovostt
подстанция тепличная
teplichnayanovo
teplichnayanovos
teplichnayanovost
teplichnayanovostt

Сonstruction of substation 35/10 KW «Teplichnaya»

0 Type of
works
1 Reviews
0
  • Topographic-geodetic and geological surveys
  • Development of the design-budget documentation and its coordination with the energy supply organization, control, and utilities;
  • Laying of two cable lines (CL) of 35 kV;
  • Cable laying under the river bed;
  • Construction of two overhead lines of 10 kV with a protected insulated self-supporting insulated wire-3 (ssiw-3);
  • Block-modular design of the SS

Instated :

  • 14 high-voltage bays outdoor complete switchgear (OCS);
  • 4 power transformers 35/10 kV;
  • blocks of switching equipment 35 kV;
  • a modular building of a general substation control center (GSCC) with self-produced relay protection cabinets.

  • Installation of the ASCME system (automated system for commercial metering of electricity);
  • A full range of commissioning and high-voltage tests has been carried out.
1
Substation 35/10 «Teplichnaya»
Review of "Realty ESTATE" on the design and construction of 35/10 "Teplichnaya"
Want to build a similar project, but don't know where to start? Request a manager consultation
or
Fill out the brief
Order project