- Topographic-geodetic and geological surveys
- Development of the design-budget documentation and its coordination with the energy supply organization, control, and utilities;
- Laying of two cable lines (CL) of 35 kV;
- Cable laying under the river bed;
- Construction of two overhead lines of 10 kV with a protected insulated self-supporting insulated wire-3 (ssiw-3);
- Block-modular design of the SS
Instated :
- 14 high-voltage bays outdoor complete switchgear (OCS);
- 4 power transformers 35/10 kV;
- blocks of switching equipment 35 kV;
- a modular building of a general substation control center (GSCC) with self-produced relay protection cabinets.
- Installation of the ASCME system (automated system for commercial metering of electricity);
- A full range of commissioning and high-voltage tests has been carried out.