Launch of the main water supply system in the Ingulets River
Area:
35 km.
The construction period: 06.2024 - 04.2024
Type of
works
works
Connection of a pumping station to a 35 kV network
As part of the project, a new 35 kV overhead line was constructed to connect the pumping station to the main water pipeline.
Main works and solutions:
- Laying of a new 35 kV power line route
- Geodetic surveys
- Construction of two mutually redundant 35 kV branches from support No. 43
- Installation of two single-transformer 35/0.4 kV transformer substations on the territory of the pumping station
- Construction of two 35 kV power lines in accordance with technical specifications
- Installation of diesel generators for backup power supply
- Supply and commissioning of switchboard equipment
- Installation of a perimeter security system
- Commissioning works
- Landscaping of the territory
- Connection of the pumping station to the 35 kV network
- As part of the project, a new 35 kV overhead line was built to connect the pumping station to the main water pipeline.
- Laying of a new 35 kV power line route
- Geodetic surveys
- Construction of two mutually redundant 35 kV branches from support No. 43
- Installation of two single-transformer 35/0.4 kV transformer substations on the territory of the pumping station
- Construction of two 35 kV power lines in accordance with technical specifications
- Installation of diesel generators for backup power supply
- Supply and commissioning of switchboard equipment
- Installation of a perimeter security system
- Commissioning works
- Landscaping of the territory
- Types of works
- Installation and connection of pumps
- Centering of units
- Laying, connecting, and painting of pipelines
- Installation of 6 kV power cells at 3 stations (42 in total)
- 0.4 kV and TM equipment (24 cells in total)
- Machine room cabinets (power supply, control, ASK TP)
- Production, installation, and commissioning of the ASK TP system